Mobile
Log In Sign Up
Home > english-chinese > "depth of excavation" in Chinese

Chinese translation for "depth of excavation"

开挖深度

Related Translations:
atrophic excavation:  萎缩性陷凹
shaft excavation:  打竖井井筒掘迸
tunnel excavation:  隧不洞开挖隧道开挖隧道开凿
bulk excavation:  大规模挖土大面积规模开挖大型挖掘工程
belled excavation:  钟形挖掘
toe excavation:  坡脚开挖
unclassified excavation:  未经分类的开挖
borrow excavation:  借土开挖取土开挖
collar excavation:  井颈开凿
earth excavation:  土方开挖挖土方挖土工程
Example Sentences:
1.Confirm the location of the underground electricity cable by exposing the cable using hand - dug trial holes should the depth of excavation be 450 mm or more under the ground
如地下挖掘深度为450毫米或以上,必须透过手挖试孔使地下电缆显露以确定电缆的位置。
2.In addition , request the competent person to locate the depth profile of all underground electricity cables in the area should the depth of excavation be 450 mm or more under the ground
此外,如地下挖掘深度为450毫米或以上,也必须要求合资格人士测定地下电缆的深度。
3.Excavation engineering is an ancient subject . but with the increase of the depth of excavation and density of surrounding constructions , the traditional method has not been suited to the development of excavation engineering . so the concept of deformation control design has been represented
基坑工程是一个占老的课题,但是随着基坑深度的发展及其与周围建筑密度的增加,传统的方法已不再适合于基坑的发展,为此人们提出了变形控制设计概念。
4.And the conclusion can be obtained thatrafter excavation , the horizontal deformation increased continuedly with the depth of excavation . while the whole deformation takes on a tendency of nearly horizon and slightly downward . the middle part of the shiplocks maintains the state of unloading feedback during the excavation , when the excavation is finished , it expands toward two sides
本文研究发现开挖完成后闸室直立墙和南北边坡的岩体水平方向变形随着开挖深度的下降而不断增大,开挖完成后的总体变形表现为近水平略向下。中隔墩在开挖过程中,始终处于卸荷回弹,开挖完成后,中隔墩向两侧张开。
5.In the simulation and analysis on culvert construction , the method of foundation - pit excavation layer by layer and step by step was used , i . e . the method that makes the surface of excavation have no stress , when the elements were excavated gradually in period of construction . at this process , the state of soil is unloading , the laws of stress field and displacement field with the depth of excavation were studied . based on the obtained stress field and displacement field after the excavation was completed , by using of the newly increased filling - elements " gravity and the grinding force , the simulation of the construction of body of the culvert and foundation - pit ' s filling layer by layer had also been done in this dissertation
用有限元法模拟分析涵洞基坑开挖时,采用分层、分步模拟开挖过程的方法,即将计算域内单元分层“挖去” ,使开挖表面成为无应力表面的方法,分析土体在卸载状态时的应力场和位移场随开挖深度的变化规律;在洞体施工后,回填土体时,据开挖完成时的应力场、位移场,通过逐级增加计算域内的单元数目,施加每级新增加单元的自重荷载,利用有限元法模拟基坑及上覆土体分层填筑的施工过程,这不仅反映土体处于再加载应力状态时,填土受力及变形的一般规律,而且这种将地基? ?涵洞? ?土体作为一个统一整体进行模拟的方法,量化了三者之间的相互作用关系。
Similar Words:
"depth of electrode insertion" Chinese translation, "depth of embedment" Chinese translation, "depth of engagement" Chinese translation, "depth of erosion" Chinese translation, "depth of evaporation" Chinese translation, "depth of exploration" Chinese translation, "depth of extra-dredging" Chinese translation, "depth of fading" Chinese translation, "depth of feedback" Chinese translation, "depth of field" Chinese translation